July Maintenance & Repairs
July Works Carried Out
- General cleaning and maintenance 
What is to come in August:
All electrical items still await repair.
- 2 x toilets need to be rebuilt 
- Light switch changed throughout 
- Change globes that are blown 
- Arrows for switch panel 
- Replace hinges on back table (on back order) 
- Water pressure regulator 
- Hot water tank 
- 1m 20ml thick wall-graded hose 
 
                        